欧美午夜精品成人_亚洲天堂成人av_国产制服丝袜_思思热在线视频播放_亚洲国产无套无码AV电影国产_九一香蕉视频在线_人妻夜夜爽天天爽一区資源免費看_欧美一区二区高潮白浆_老熟女激烈的高潮_本道9丨久久久综合无码

CN
Your current location:front page>> Product >> Dry oil lubrication part

Contact

Qidong Hengshun Lubrication Equipment Co., Ltd.

connect:Mr. Wang

cell phone:13862980878

hotline:0513-83637668

fax:0513-83637098

After sales:0513-83635700

Mail:qd3637668@163.com? ??

URL:delcan.cn


DF type electromagnetic reversing valve

Product attributes

  • Category:Dry oil lubrication part
  • Number of views:1
  • release date:2024-09-14
  • Product overview
  • Product overview

1. Conditions of use


It is used in the electric terminal centralized lubrication system. The electric control cabinet receives the signal from the P V-2E pressure control valve and controls the valve to realize alternate oil supply and opening of the two oil supply main pipes.

The cylindrical slide valve structure is adopted to ensure tight opening and closing of the valve port and maintain high pressure without leakage for a long time. The use of powerful electromagnets and spring buffers ensures reliable commutation.

1571821500194856



3. Instructions for use

The penetration of grease used is 310~385 (NLGI 0#~1#)

When the pressure in the oil reservoir (oil return port pressure) is below 3MPa, it can be directly

Use directly. When 3~10MPa, external oil drainage method is required.


4. Action description

Location S-1

The picture shows the oil supply end state. The solenoid a and b of the solenoid valve are both powered off.

Magnetic, pressure oil inlet is closed,Dry thin oil lubricationThe pump is out of service. In this state1571821573484560


In this state, both oil supply main pipes are open to the oil reservoir.

Location S-2

When the pump starts, electromagnet A is energized to obtain magnets, and the grease output by the pump

It is sent to the oil supply main pipe L1 through port A, and the oil supply main pipe L2 is still open to the oil reservoir.

Position P-1

A pressure control valve is installed at the end of the oil supply main pipe. When the pressure at the end of the main pipe L1

When the set pressure of the pressure control valve is exceeded, its slide valve is pushed to the right.

Location P-2

Move the slide valve to the right, pull the contact linked to it to the left, and move the slide valve to the left.

The process switch L S-1 is in the on state and sends a signal to the electric control cabinet to cause the electromagnetic

When iron a is powered off, the pump stops working and returns to position S-1.

When lubricating next time, electromagnet B is energized, and the lubricant output from the pump is absorbed through port B.

is sent to the oil supply main pipe L2, and the pressure control valve acts to make the travel switch open.

state.



1571628027993635

URL of this article:/index.php?c=show&id=90
Product
Dry oil lubrication part
Thin oil lubrication part
Smart lubrication
Process lubrication
about Us
Company profile
Honor
Contact

Address: No. 010, Xinglong Road, Huilong Industrial Park, Qidong City

Sales hotline: 0513-83637668

Company fax: 0513-83637098

After-sales service: 0513-83635700

Website: delcan.cn

E-mail:qd3637668@163.com

工藝潤滑公司

Scan to learn more